In order to meet the needs of mobile users, the aircraft rack design a very solid, and if the regular removal equipment is not only to the military equipment on the hard ground and can be formed if the fixed installation, the best a concrete foundation.
Installation, please refer to the installation diagram shown. Steady first mainframe and fixed installation refinancing fan, Cyclone, and the duct connection.
The connection between the flange must use asbestos rope, rubber or foam seal, and then use talcum powder mixed with white latex into a paste, got strict sealed to prevent leakage affect production.